Aligned the Landing Gear by clamping a piece of angle iron to the face of the gear legs. Then we pulled a string to either side, cross checking it with a tape measure. The string method is similar to how we used to mount wings on RC aircraft.Also dropped four plumb bobs across another piece of angle on the floor to cross check.Right gear leg mostly drilled. Lots of Boelube all over. The outer holds on both the inner and outer weldments weren’t drilled yet.Right gear leg drilled.
Started working on mounting the landing gear. Drilled the center holes on the U-804 inboard main gear attach brackets and started to line up the gear. Decided we wanted to recheck the various methods and needed a few more tools to do it right and paused for the time being.
Total Build Hours: 383.25
Empennage: 149
Fuselage: 207.75
Wing: 0.0