Fabricated a bracket for the Andair fuel valve. Instead of nuts on the backside, I used nutplates.
Also spent quite a bit more time than anticipated installing the nut plates for the left and right covers.
Not many pics, just this of the fuel valve plate.
Primed all the stiffeners and floor boards.
Back riveted the stiffeners on, and added the nutplates.

Total Build Hours: 383.25
Empennage: 149
Fuselage: 207.75
Wing: 0.0