RV8 Build Log

Search
Skip to content
  • About
Fuselage, Landing Gear

Final Landing Gear

Hours this entry: 4.0
November 6, 2020 chris
Download PDF

Installed the Landing gear and torqued to specs. The boys tried it on for size after we removed it from the rotisserie.

DWG75U-801-LU-801-RU-803UU-804UU-805-1

Post navigation

Previous PostLanding Gear Part 2 DrillingNext PostInstrument Sub Panel

Recent Posts

  • Canopy Rail Slider – Part 3
  • Canopy Rail Slider – Part 2
  • Canopy Rail Slider – Part 1
  • Motor mount Install
  • Baggage Door Riveting

Categories

  • Avionics
  • Cockpit
  • Controls
  • Elevator
  • Empennage
  • Fuselage
  • Horizontal Stabilizer
  • Instrument Panel
  • Landing Gear
  • Rudder
  • Tools
  • Uncategorized
  • Vertical Stabilizer

Archives

  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • November 2018
  • September 2018
  • August 2018
  • July 2018
  • January 2018
  • September 2016
  • August 2016
  • March 2016
  • December 2015
  • November 2015
  • September 2015
  • August 2015
  • July 2015
  • June 2015
  • May 2015
  • March 2015
  • February 2015
  • January 2015
  • December 2014
  • November 2014
  • October 2014
  • September 2014
  • August 2014
  • July 2014
  • June 2014
  • May 2014
Total Build Hours: 383.25
Empennage: 149
Fuselage: 207.75
Wing: 0.0
Proudly powered by WordPress