Re-installed the control column, adjusted hardware on the pitch servo. Match drilled the skin support ribs (F-8104) between the top skin and the WD-814 rollbar.
Total Build Hours: 383.25
Empennage: 149
Fuselage: 207.75
Wing: 0.0
Empennage: 149
Fuselage: 207.75
Wing: 0.0
