Set the motor mount with temporary bolts, drilled/reamed them larger one at a time. Removed the mount, cleaned the holes and then installed the AN-6 motor mount bolts, and snugged the castle nuts.
Total Build Hours: 383.25
Empennage: 149
Fuselage: 207.75
Wing: 0.0