Rollbar, Forward Fuselage Skin & Avionics Door

Hours this entry: 8.5
Download PDF

Fit and drilled the Rollbar.

Prepared the items for the forward fuselage skin, including F-803C-1 and all F-821x baggage door support strips. Realized I was going to have some interference between the Avionics door I cut and F-873G which is the upper brace. I had to bend the tab the opposite way on F-873G and create a doubler for it.