More Vertical Mounting

Hours this entry: 4
Download PDF

Finished getting the vertical mounted and riveted the front joiner and spacer to the spar. Got the holes into the Horizontal drilled to final size, and bolted down as well.

Next it was time to work on the Elevator horns and get them drilled. 

Unlike some other builders, our horns were pretty well in line with each other and the hole for the pushrod end ended up perfect.