Worked on rolling the leading edges for the Rudder and Right Elevator. Found the best method was the Vans method with tape and the steel pipe with one of us on each end. A little more massaging and then we can blind rivet them.
Total Build Hours: 383.25
Empennage: 149
Fuselage: 207.75
Wing: 0.0
Empennage: 149
Fuselage: 207.75
Wing: 0.0


