Worked on rolling the leading edges for the Rudder and Right Elevator. Found the best method was the Vans method with tape and the steel pipe with one of us on each end. A little more massaging and then we can blind rivet them.
Started to assemble the left and right elevators. Fit the ribs and prepped the counterbalance weights. I need to finish priming the elevator skins and get the stiffeners back riveted on before I can continue here.
Finished match drilling the stiffeners to the Elevators, then I deburred and dimpled the stiffeners. The DRDT2 is at the hangar so I couldn’t dimple the skins yet.
Total Build Hours: 383.25
Empennage: 149
Fuselage: 207.75
Wing: 0.0