Horizontal and Vertical work

Hours this entry: 4.5
Download PDF

Spent more time priming the rest of the parts for the right side of the Horizontal. Quick shot of some of the ribs and stiffener.

20140722-200400-72240469.jpg

In addition to the priming, it was time to start deburring, dimpling and prepping the Vertical stabilizer for primer.