Deburring and Dimpling the Horizontal

Hours this entry: 3.5
Download PDF

Switched back from working on the Vertical Stabilizer to prepping the Horizontal for primer. Lots of deburring, dimpling and scotchbriting. I had also forgot to drill the trim cable hole in the front left spar, so that was done as well.

20140710-153552-56152912.jpg

More of the ribs after being dimpled and hit with a quick pass of the Scotchbrite pads.

20140710-153553-56153245.jpg

20140710-153553-56153649.jpg

I’m going to take the parts home from the hangar so I can prime them.