Spent quite a bit of time prepping parts over the last month to start assembly of the horizontal. This included alot of de-burring, fluting the ribs and match drilling parts.
Speaking of fluting.. We struggled with the first couple of ribs, but found this great EAA video that drastically sped up the time it took flute the ribs.

