RV8 Build Log

Search
Skip to content
  • About
Empennage, Horizontal Stabilizer

Looks like an airplane part

Hours this entry: 5.5
July 1, 2014 chris
Download PDF

Spent quite a bit of time prepping parts over the last month to start assembly of the horizontal. This included alot of de-burring, fluting the ribs and match drilling parts.

Speaking of fluting.. We struggled with the first couple of ribs, but found this great EAA video that drastically sped up the time it took flute the ribs.

20140701-175340-64420418.jpg

HS-603PPHS-702HS-706HS-707HS-708HS-801PP

Post navigation

Previous PostMore Front SparNext PostLeft Horizontal Drilling

Recent Posts

  • Canopy Rail Slider – Part 3
  • Canopy Rail Slider – Part 2
  • Canopy Rail Slider – Part 1
  • Motor mount Install
  • Baggage Door Riveting

Categories

  • Avionics
  • Cockpit
  • Controls
  • Elevator
  • Empennage
  • Fuselage
  • Horizontal Stabilizer
  • Instrument Panel
  • Landing Gear
  • Rudder
  • Tools
  • Uncategorized
  • Vertical Stabilizer

Archives

  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • November 2018
  • September 2018
  • August 2018
  • July 2018
  • January 2018
  • September 2016
  • August 2016
  • March 2016
  • December 2015
  • November 2015
  • September 2015
  • August 2015
  • July 2015
  • June 2015
  • May 2015
  • March 2015
  • February 2015
  • January 2015
  • December 2014
  • November 2014
  • October 2014
  • September 2014
  • August 2014
  • July 2014
  • June 2014
  • May 2014
Total Build Hours: 383.25
Empennage: 149
Fuselage: 207.75
Wing: 0.0
Proudly powered by WordPress